EasyManua.ls Logo

GE Discovery LS - Appendix B System Calibration Quick Guide

GE Discovery LS
358 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 2307224-100, REVISION 6DISCOVERY LS SYSTEM SERVICE MANUAL
Appendix B - System Calibration Quick Guide Page 347
Appendix B - System Calibration Quick Guide
The table below contains a list of the calibration procedures necessary for the regular operation of
the Discovery LS PET-CT system. The PET calibration procedures are described in the PET
Advance Operator Manual, Direction 2280383-100. The calibrations should be performed in the
order presented in the table.
Note: Well Counter Correction should be performed after running the VQC procedure.
No. Calibration Type Frequency Duration
1 Reboot Daily 5 min.
2Singles:
Update Gain
Weekly
When performing position
(crystal map calibration).
After detector or ACEM board
replacement.
50 - 240 min.
3Singles:
Position
Every 3 months.
After detector replacement.
50 min.
4Singles:
Energy
Every 3 months.
When performing position
(crystal map calibration).
50 min.
5 CTC Weekly 10 - 15 min.
6 Blank Scan Daily 30 min.
7 Normalization Every 3 months 12, 18, or 24 hours
depending on
sources strength.
8 VQC Weekly during 4-8 weeks after initial
installation, then monthly.
15 min.
9 Well Counter
Calibration
Every 3 months. 1 - 2 hours
10 Tube Warm-Up Daily 1 min.
11 Fast Cals Daily
(Once every 3 months, a full
System call must be performed by a
Service Engineer.)
30 min.
12 Clean Database Weekly 20 min.

Table of Contents

Related product manuals