EasyManua.ls Logo

GE Discovery LS - Figure 7-7: Driving Mechanism - External Assembly; Figure 7-8: PET Gantry Drive Mechanism Sub-Assemblies (View 3)

GE Discovery LS
358 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 2307224-100, REVISION 6DISCOVERY LS SYSTEM SERVICE MANUAL
Page 230 Chapter 7 - Gantry
7.) Refer to Figure 7-7. Assemble the small Nut Bearing Housing, P/N HB60002014, to the
Tracking Bearing Basis using two M8 x 16 mm screws.
Figure 7-7: Driving Mechanism – External Assembly
8.) Take the tracking trapezoidal screw, 2294696 (lead screw), insert it into the small bearing unit
and fix the retainer ring in position.
9.) Refer to Figure 7-4 and Figure 7-5. Take the Driving Nut Holder and assembled parts, and
screw them into the Tracking Trapezoidal Screw.
10.) Refer to Figure 7-8. On the front side of the gantry, assemble the tracking screw support
Flange, P/N 2299163, onto the Tracking Screw Support Bracket, P/N 2299164, using three
M4 x 12 mm screws.
Figure 7-8: PET Gantry Drive Mechanism Sub-Assemblies (View 3)
Retaining Ring
Bearing Housing
Flange
Tracking Screw Support Bracket
M6 x 10 mm
Note: Viewed from inside the PET Gantry.

Table of Contents

Related product manuals