8 Setting the Analytical Parameters and File Management
8.3 Specifying the Analytical Flow Line Components ([Line Config])
91
GC-2010 Plus
Q Line configuration examples
Suppose that a SPL (split/splitless injection port), a WBI (direct injection port), a FID
(hydrogen flame ionization detector) and a TCD (thermal conductivity detector) are installed.
(1) When using only the SPL and the FID
Select the SPL and the FID for line 1.
In this case, only the temperature of the SPL and the FID will be controlled. Carrier gas
and detector gas will be supplied.
Fig. 8.3.2   Line configuration (Example 1)
INJ
DET
COL

Table of Contents