16 Special Functions
16.7 Service and Maintenance
264
GC-2010 Plus
16.7.5 INITIALIZATION
16.7.5.1 Screen description
Select “7. SERVICE/MAINTENANCE” from the [FUNC] key screen, and then select “3.
INITIALIZE”, to display the Initialization screen shown in Fig. 16.7.6.
When you move the arrow cursor and press the [ENTER] key, the initialization
confirmation screen (Fig. 16.7.7) appears. On this screen, press the [INIT] (PF menu)
key to initialize the selected item.
16.7.5.2 Parameter list
INITIALIZE CONFIGURATION
This item initializes configuration settings such as heated zone temperature limits and
ready check parameters. However the column temperature limit is saved in the analysis
file and is not reset. Analysis files 09 cannot be initializend.
INITIALIZE INSTALLATION
This item initializes the installation settings of injection ports, flow controllers, etc.
INITIALIZE RAM
This item initializes the RAM, erasing all data, including analysis files 09, configuration
and installation settings.
Initialize the RAM when there is a RAM problem.
INITIALIZE ALL
This item initializes all settings including.
Analysis files 09
Fig. 16.7.6   Initialization menu screen Fig. 16.7.7   Initialization confirmation screen

Table of Contents

Related product manuals