16 Special Functions
16.6 GC Configuration
244
GC-2010 Plus
16.6.6 Setting the Ready Check Parameters
The Ready Check verifies whether the preset analytical conditions have been met.
When the selected items reach the specified settings, the STATUS light illuminates in green.
16.6.6.1 Screen description
Select “6. GC CONFIGURATION” from the [FUNC] key screen, and then select “4.
READY CHECK”, to display the ready check screen shown in Fig.16.6.5
Set each parameter to “yes” or “no”. All parameters with “yes” must reach their initial
parameter starts in order for the GC to be ready and the STATUS light to turn green.
16.6.6.2 Parameter list
TEMP. PORT
TEMP
Selection: Yes/No, Default: Yes
Indicate which headed zones should be included in the ready check.
CARRIER GAS
Selection: Yes/No, Default: Yes
Indicate which injection port carrier gas flow line should included in the check.
The displayed items depend on the injection port type.
SEPTUM PURGE
Selection: Yes/No, Default: Yes
Indicate which injection port septum purge flow lines should included in the check.
The displayed items depend on the injection port type.
DET FLOW GAS
MAKE UP
Selection: Yes/No, Default: Yes
HYDROGEN
Selection: Yes/No, Default: Yes
Fig. 16.6.5 Ready Check setup screen