Site Preparation Checklist
Chapter 10
Site Planning and Preparation
The condition of the installation site is extremely important for proper operation of the
FSP 3000 C equipment.
This chapter describes planning and preparation activity for a typical
installation. It does not take into account local building or electrical
codes. Check your site-specific planning or consult respective
specialists.
Site Preparation Checklist 137
General Site Requirements 138
Compliance Criteria 139
Environmental Specifications 140
Heat Dissipation 140
Site Preparation Checklist
Checking power requirements and power cable requirements must be
performed by a qualified electrician.
As the customer, you are responsible for ensuring that the site conforms
to all requirements and that necessary peripherals are made available to
ADVA Optical Networking Service personnel during installation.
The following checklist summarizes the tasks necessary to ensure your site is ready for
the FSP 3000 C equipment.
Check Task For More Information
Verify that environmental factors do not exceed the
FSP 3000 C product tolerances.
l Compliance Criteria
l Environmental Specifications
FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016) 137