Installing the FD-128D Front Cover
Installing the FD-128D Front Cover
This procedure assumes that you have completed the physical
installation of the FSP 3000 C components and connections.
1. Verify that you are properly grounded with an anti-static wrist strap or heel strap
connected to the grounded ESD jack.
2. Align the four holes on the shelf with the four tabs in the cover and press. All four tabs
should click into place. Be careful not to pinch any fibers.
3. Repeat this procedure for each FD-128D shelf.
l Electrostatic Discharge Damage Prevention and Warning
l Cooling and Airflow
l Shelf Front Covers
254 FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016)