General Site Requirements
Check Task For More Information
Become familiar with the following:
l Site plan or floor plan
l Installation plan including details of the current
electrical systems
Select the type of rack and be aware of rack
installation requirements.
l Supported Rack Requirements
Plan rack location, including required space
clearances around the rack and appropriate airflow.
l Clearance Requirements
Verify that the maximum weight limitations of the
floor/raised floor are not exceeded.
Secure rack to floor and building structure.
l Building Structure Connection for Rack
Acquire cables and connectors and have them clearly
labeled.
Locate sites for connection of system grounding.
l DC Power Electrical Safety Guidelines
and Warnings
Have the necessary power source and grounding
equipment in place and tested.
Assemble the required Ethernet cables, the serial
cable, and the USB cable with the appropriate
connectors, if necessary.
l Cables
Test the local input power, client/network lines, and
fiber communication network.
l Unpacking and Inspecting the Shelves and Components
l General Safety Guidelines and Warnings
l Electrical Safety Guidelines and Warnings
General Site Requirements
Only authorized personnel should be allowed to access the FSP 3000 C system. Install
the equipment in a restricted-access area that meets the following criteria:
l Is a climate-controlled environment — Install the FSP 3000 C in an air-conditioned
equipment room with year-round humidity control and recirculated, filtered air;
l Is an indoor controlled office environment (such as a Network Telecommunication
Facilities);
l Is secure
o
Access can only be gained by personnel who have been instructed about location
restrictions and all necessary precautions.
o
Access is gained by means of a tool, lock and key, or other means of security.
Access devices are controlled by the person in charge of the location.
l Complies with all applicable local and national safety regulations;
138 FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016)