EasyManua.ls Logo

Adva FSP 3000 - Installation Overview; Installation Overview - SH12 and SH4 R Shelves

Adva FSP 3000
375 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Overview SH12 and SH4R Shelves
Chapter 15
Installation Overview
Installation Overview SH12 and SH4R Shelves 169
Installation Overview 4U Shelf 171
Installation Overview 1U Shelf 171
Service Personnel Assumptions 172
Adhere to the cautions and warnings throughout this document for a
safe and hazard-free installation. Personnel must understand and
apply the safety guidelines provided in this document. In addition, the
safety notices on the equipment labels should be strictly followed.
Before you start any of these procedures, read the entire section for
important information. For complete safety and compliance information,
see PART 6: SAFETY GUIDELINES.
Installation Overview SH12 and SH4R
Shelves
When you install an SH12 or SH4R shelf, be sure that you follow the installation
procedures in the proper sequence. The following table is an installation procedure
checklist, showing the procedures in the order in which they should occur.
Before installing the equipment, be aware of important rack and
accessory installation requirements. See Supported Rack
Requirements and Accessory Installation Requirements for more
information.
Before proceeding with the installation and cabling, be aware of
standard safety practices and the hazards involved in working with
electrical circuitry to prevent accidents.
FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016) 169

Table of Contents

Related product manuals