Installing the SH12 Lower Front Cover
l Installing the SH12 Lower Front Cover
l Electrostatic Discharge Damage Prevention and Warning
l Cooling and Airflow
l Shelf Front Covers
Installing the SH12 Lower Front Cover
This procedure assumes that you have completed the physical
installation of the FSP 3000 C components and connections.
This front cover houses an air filter for the PSM-DCs and it must be
installed.
1. Verify that you are properly grounded with an anti-static wrist strap or heel strap
connected to the grounded ESD jack.
2. With the filter side of the lower front cover down, insert the tabs on the right side of
the cover into the receiving holes in the shelf.
Figure 75: Positioning the Lower Front Cover
3. Swing the left side of the lower front cover into place.
4. Press the cover inward until the latch snaps into place. Be careful not to pinch any
power cables.
5. Repeat this procedure for each SH12 shelf.