Chapter 23
Installing the Infrastructure Modules
Required Tools and Equipment 215
Installing the CEM 215
Installing the ECM-2 216
Installing the FTM-2 in the SH12 216
Installing the FTM-4 in the SH4R 217
Installing the PSM-DC in the SH12 218
Installing the PSM-AC4 in the SH4R 218
For the SH12, the protection plate must be removed before installing
modules.
Use care when installing modules in a shelf. Ensure the modules are
properly aligned with the appropriate slot guides. Do not force a
module into a slot or onto the backplane connectors. If you are having
problems installing a module without using excessive force, stop
immediately and contact Technical Services.
Never reach into a vacant shelf slot. Contact with the adjacent
modules or the connectors on the backplane could result in damage
to the equipment. Exposed circuitry could also constitute an energy
hazard.
Risk of electromagnetic disturbances!
Be careful not to damage the EMI shielding gasket on the module
faceplate edges when inserting it into the slot. Otherwise EMC
compliance cannot be achieved.
l Electrostatic Discharge Damage Prevention and Warning
l Installation Overview — SH12 and SH4R Shelves
l Handling Equipment Precautions and Guidelines