EasyManua.ls Logo

Adva FSP 3000 - Installing the FD-128 D Front Cover

Adva FSP 3000
375 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the FD-128D Front Cover
l Electrostatic Discharge Damage Prevention and Warning
l Cooling and Airflow
l Shelf Front Covers
Installing the FD-128D Front Cover
1. Verify that you are properly grounded with an anti-static wrist strap or heel strap
connected to the grounded ESD jack.
2. Align the four holes on the shelf with the four tabs in the cover and press. All four tabs
should click into place. Be careful not to pinch any fibers.
3. Repeat this procedure for each FD-128D shelf.
l Electrostatic Discharge Damage Prevention and Warning
l Shelf Front Covers
304 FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016)

Table of Contents

Related product manuals