Unpacking a 4Uor 1UShelf
5. Remove the unit box (Styrofoam) with the shelf and place it on a static-dissipative
mat.
6. Remove everything else from the cardboard box.
7. Take inventory. A packing slip is located in the box. Compare the contents of the box
with the packing slip and the copy of the purchase order list or equipment list
provided by ADVA Optical Networking to ensure complete and accurate shipment.
Make note of missing items, if necessary.
8. Remove the shelf from the shipping box.
9. Move the shelf to a stable surface in the work area and place it on a static-dissipative
mat. Do not release your grip until the shelf is secure.
ELECTROSTATIC CAUTION
Risk of damage due to electrostatic discharge!
Keep the shelf in its ESD protective bag until you are ready to inspect it.
Do not drop the shelf or any modules on a hard surface - damage to
internal components may result. If any components are dropped,
return them to ADVA Optical Networking for examination and repair.
10. Verify that you have the proper shelf type, using the Product IDLabel for
identification.
11. Visually check the shelf and accessories for external damage. If identified, make
note of any damaged or missing items.
12. If any items are missing or you need additional information, notify your customer
service representative or ADVA Optical Networking immediately.
Each shelf comes with two 19-inch rack-mounting brackets preinstalled.
13. Save the packaging material until the operational checkout of the FSP 3000 C
equipment is complete. Storing all the shipping boxes and packaging material
enables the FSP 3000 C components to be repacked for a possible transport to
another installation site or to be returned for a needed repair.
l Shipment Contents— FD-128D
l Shipment Contents — FMT/1HU
l Qualified Personnel Warning
l Shelf Lifting and Moving Guidelines
l Handling Equipment Precautions and Guidelines
l Electrostatic Discharge Damage Prevention and Warning
180 FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016)