EasyManua.ls Logo

Anritsu Network Master Pro MT1000A - 7.2 APS

Anritsu Network Master Pro MT1000A
449 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7.2 APS
The APS (Automatic Protection Switching) test measures the switching time in
protecting the system from failure
Switching time is defined below.
The start and stop trigger can be selected independently.
Trigger event can be selected from the high order OTU and ODU.
The pass/fail thresholds for switching time can be set.
Test results include pass/fail, switching time (minimum, maximum and
average) and the measurement count of switching.
7.2.1 Ports Setup and Status
The first step in running an application is to set up the port interfaces. This is
done on the Ports Setup screen, which also provides port status
information.
The setup options and status information related to the OTN interface are
described in the following section:
OTN Setup and Status
7.2.2 Test Setup
7.2.2.1 Thresholds
The following screen is displayed for the Test Setup.
OTN Applications APS
MT1000A Network Master Pro Page 333

Table of Contents

Other manuals for Anritsu Network Master Pro MT1000A

Related product manuals