7E- 14 DIFFERENTIALS
29) Apply the specified tightening torque to the screws fixing
the lids of the rolling elements of the differential box.
Tightening torque screws fixing rolling element lids :
8 ÷ 8.5 Kg-m (80 ÷ 85 Nm)
30) Assemble the brake ensemble (2), formed by the elastic pin
and the fixing plate.
31) Assemble the differential group reversing the dismantling
order and taking account the specified tightening torque in
the complemenatry task.
2
2