SAFETY INFORMATION
Remove Lock-Out Tag Out Devices
-16 Aquastorm™ Series Options Guide Rev. 1
Remove Lock-Out Tag Out Devices
Introduction Prior to removing the Lock Out device and resuming system operation, ensure the
following is complete:
• Perform and complete each scheduled maintenance, installation, upgrade, or
repair task
• Replace any worn parts, if replacement is required
• Complete all required cleaning steps, if cleaning is required
• Replace all enclosures removed during maintenance, installation, upgrade, or
repair procedures
• Latch or appropriately tighten down all enclosures removed during
maintenance, installation, upgrade, or repair operations
Safety To ensure personal safety and avoid equipment damage, observe the following:
CAUTION
If items removed during maintenance, installation, upgrade, or repair procedures
are not properly replaced, damage to the equipment can occur.
ATTENTION
The person who attaches a lock-out device is responsible to remove the device.
Procedure Use the following steps to remove facility and Aquastorm™ machine lock-out and
tag-out devices:
1. Notify all affected employees.
2. Locate and remove the lock-out device from the facility main power source.
3. Turn the facility main power source to the On position.
4. Locate and remove the lock-out device from the exit end of the machine.
5. Place the Main Power Disconnect in the On position.
6. On systems with an optional EPS (Emergency Power Supply) battery backup
installed, toggle the battery control to the On position.
7. Resume normal system operation. For detailed information refer to the
Aquastorm 200™ or Aquastorm 100™ Operation Manual.