BLOWER ENHANCEMENTS
Resume System Operation
16-326 Aquastorm™ Series Options Guide Rev. 1
16
Resume System Operation
Introduction When repair procedures are complete, prepare the system to resume operation.
Procedure Use the following steps to reconnect the blower motor housing and return the
system to operation:
1. Locate and replace the turbine blower belt guard over the blower motor belt.
2. Use a 3/16 in. Allen wrench to replace and tighten the two (2) ¼-20 x ¾in.
socket head cap screws and secure the turbine blower belt guard in place.
3. Re-attach the air filter housing and tube to the blower motor.
4. Replace any front or rear system panels removed during repair steps.
5. Remove Lock Out/Tag Out tags. See Lock-Out Tag-Out on page 10.
6. Turn system power On.
7. Resume system operation. For detailed information refer to the Aquastorm
200™ or Aquastorm 100™ Programming and Operation Guide.