EasyManua.ls Logo

Adva FSP 3000 - Page 302

Adva FSP 3000
375 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing the SH12 Upper Front Cover
Installing the SH12 Upper Front Cover
1. Verify that you are properly grounded with an anti-static wrist strap or heel strap
connected to the grounded ESD jack.
2. Position the upper cover on the front of the shelf so that the latches and brackets on
either side align. The curvature will be at the top.
Figure 87: Positioning the Upper Front Cover
3. Press the cover inward until both latches snap into place. Be careful not to pinch any
fibers or cables.
l Electrostatic Discharge Damage Prevention and Warning
l Cooling and Airflow
l Shelf Front Covers
Installing the SH12 Lower Front Cover
1. Verify that you are properly grounded with an anti-static wrist strap or heel strap
connected to the grounded ESD jack.
2. With the filter side of the lower front cover down, insert the tabs on the right side of
the cover into the receiving holes in the shelf.
302 FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016)

Table of Contents

Related product manuals