Required Tools and Equipment 215
Installing the CEM 215
Installing the ECM-2 216
Installing the FTM-2 in the SH12 216
Installing the FTM-4 in the SH4R 217
Installing the PSM-DC in the SH12 218
Installing the PSM-AC4 in the SH4R 218
Installing the Traffic Modules and Pluggable Transceivers 220
Required Tools and Equipment 220
Installing a Traffic Module 221
Installing a QSFPPluggable Transceiver 222
Installing the Slot Covers 225
Required Tools and Equipment 225
Installing a Module Slot Cover 225
Connecting the Infrastructure Modules 227
Required Tools and Equipment 227
Connecting the Infrastructure Modules 227
Providing Power to the Shelves 229
DCPower Overview 229
ACPower Overview 230
Prerequisites for Connecting the DC Power 231
Prerequisites for Connecting the AC Power 231
Required Tools and Equipment 232
Shortening and Assembling DCPower Cables 233
Connecting DC Power to the SH12 Shelf 234
Connecting ACPower to theSH4R Shelf 240
Connecting the Optical Cables 243
Overview 243
Prerequisites 244
Required Tools and Equipment 244
Connecting the Optical Cables 245
Routing Optical Cables Through the FMT/1HU 247
Installing the Front Cover 250
Required Tools and Equipment 250
Installing the SH12 Upper Front Cover 251
Installing the SH12 Lower Front Cover 252
Installing the SH4RFront Cover 253
Installing the FD-128D Front Cover 254
Optical Network Leveling 255
FSP3000 C Hardware Guide - R1.1 - Issue:A (12/09/2016) 9