EasyManua.ls Logo

Daewoo MATIZ - Page 689

Daewoo MATIZ
1184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CLUTCH 5C–9
DAEWOO M-150 BL2
D103C511
D Insert the tap (M14X1.5) to the busing (No.1) (2).
D13C512A
D Insert the bushing joint pipe 09923–46040 to the
tab.
D Connect the sliding shaft 09930–30102 to the end
of the bushing joint pipe 09923–46040.
D Remove the bushing (No.1) by pulling.
D103C513
Inspection Procedure – Release Bearing
and Shaft
1. Release bearing inspection
D Check for noisy, worn and damaged release bear-
ing.
D Check for a grabbing rotation of release bearing.
D Replace the release bearing if necessary.
D103C514
2. Release shaft inspection
D Check for a warped shaft (1).
D Check for a worn fork (2).
D Replace the shaft if necessary.

Table of Contents