EasyManua.ls Logo

Speedline Technologies ELECTROVERT Aquastorm - Page 114

Speedline Technologies ELECTROVERT Aquastorm
368 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CONVEYOR ENHANCEMENTS
Checkmate™ Hold Down Conveyor Installation
6-96 Aquastorm™ Series Options Guide Rev. 1
6
Procedure Refer to the following steps and Figure 6–10 on page 95 for CheckMate™ wire
belt installation.
1. Ensure Aquastorm™ system is turned Off.
2. Locate and remove the roll of CheckMate™ conveyor wire belt from the con-
tents of the shipment.
3. Bring the roll of wire belt to the entrance end of the Aquastorm™ system.
4. Arrange the wire belt so the Closed End of the Hook Loops face toward the
EXIT end of the Aquastorm™ system and the smooth side of the wire belt
faces down. Refer to Figure on page 87.
5. Lay the wire belt on top of the conveyor belt and manually feed the Check-
Mate™ wire belt from the entrance end of the cabinet to the exit end.
6. Feed the remaining portion of the wire belt through the upper portion of the
CheckMate™ conveyor until the end of the wire belt extends over the
entrance end.
7. Bring the wire belt around to the bottom of the entrance end of the Check-
Mate™ conveyor, so that it hangs approximately 15.24cm (6 in.) over the end
and a loop can be made to ensure adequate slack in the wire belt.
8. Locate and open the cardboard container labeled Documentation Package
Enclosed and remove the wire belt master links.
9. Install the master links to connect the beginning and ending sections of the
wire belt. For details on master link installation, refer to Wire Belt Splicing
Steps on page 125.

Table of Contents