EasyManua.ls Logo

ABB IRB 6700 - Page 522

ABB IRB 6700
574 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx1200001131
Lift the motor on to the guide pins and let it
hang with the outer end a little lower when
resting on the guide pins. Do not push the
motor pinion into the gear yet!
This is done in order to fit the motor with the
axis-4 motor still fitted.
5
Remove the lifting accessory and allow the
motor to rest on the guide pins.
6
Rotation tool: 3HAC7887-1Apply the rotation tool and use it to rotate
the pinion when mating it into the gear.
7
To release the brakes, connect the 24 VDC
power supply.
8
Connect to connector R2.MP3:
+ = pin 2
- = pin 5
CAUTION
Whenever parting/mating motor and gearbox,
the gears may be damaged if excessive force
is used!
9
xx1200001129
Use caution and push the motor in position
while at the same time the motor pinion is
slightly rotated.
Pay attention to following points:
Make sure the cable exit hole is turned
the correct way. See figure!
Mate the motor pinion properly to the
gear of the gearbox.
Do not damage the motor pinion!
10
Attach two attachment screws.11
Remove the guide pins.12
Attach the remaining attachment screws.13
Continues on next page
522 3HAC044266-001 Revision: -
© Copyright 2013 ABB. All rights reserved.
4 Repair
4.8.3 Replacing the axis-3 gearbox
Continued

Table of Contents

Related product manuals