EasyManua.ls Logo

Daewoo MATIZ - Page 536

Daewoo MATIZ
1184 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POWER BOOSTER 4C7
DAEWOO M-150 BL2
D24C003
Installation Procedure
1. Install the power booster with the new cotter pin, cle-
vis pin and nuts.
Tighten
Tighten the nuts to 16 NSm (12 lb-ft).
Important: Make sure the distance from the booster
to the center of the clevis bore should be 100mm
(3.94 in.).
2. Install the evaporator unit with the screws. Refer to
Section 7B, Manual Control Heating, Ventilation, and
Air Conditioning System.
3. Install the instrument panel assembly. Refer to Sec-
tion 9E, Instrument/Driver Information.
4. Connect the vacuum hose to the power booster.
5. Install the master cylinder assembly. Refer to Section
4B, Master Cylinder.

Table of Contents

Related product manuals