EasyManuals Logo

Dräger Isolette C2000 Service Manual

Dräger Isolette C2000
524 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #450 background imageLoading...
Page #450 background image
Preventive Maintenance
Chapter 6: General Procedures
Isolette® Infant Incubator (Model C2000) Service Manual Page 6 - 11
6
Preventive Maintenance Schedule
Table 6-2. Preventive Maintenance Schedule
Function Procedure
Overall perfor-
mance
To ensure proper operation of the Isolette® Infant Incubator,
perform the “Function Checks” on page 2-6.
Patient compart-
ment
Inspect the patient compartment for signs of breakage.
Replace assemblies as necessary before placing the incubator
into service.
Oxygen sensor
cells
Replace both oxygen sensor cells annually (refer to procedure
4.3 on page 4-9).
Current leakage Perform the leakage current test (refer to procedure 6.5 on
page 6-27)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Dräger Isolette C2000 and is the answer not in the manual?

Dräger Isolette C2000 Specifications

General IconGeneral
BrandDräger
ModelIsolette C2000
CategoryMedical Equipment
LanguageEnglish

Related product manuals