GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
3-124 Section 3-4 - Preparing for Installation
PRELIMINARY
3-7-4-3 Verify the Connection to a Device
1.) Select (highlight) the device to which you want to verify the connection.
2.) Select CHECK
to start the connection to the device verification process.
The verification process may require up to one minutes. When done, a sign (prefix) displayed in
front of the listed device indicates whether the test passed (green check-mark) or failed (red X).
Figure 3-148 Verify Connection to a Device
Figure 3-149 Verification Result
Check
Select device to
be verified.
A green check-mark
indicates that the test
passed.
A red cross (as
illustrated) indicates
that the connection
failed.