GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
10-6 Section 10-4 - System Maintenance
PRELIMINARY
Section 10-4
System Maintenance
10-4-1 Preliminary Checks
The preliminary checks take approximately 15 minutes to perform. Refer to the Vivid S5 N or Vivid S6
N User Manual whenever necessary.
Table 10-3 System Preliminary Checks
St
ep Item Description
1
Ask & Listen Ask the customer if they have any problems or questions about the equipment.
3
Power-up
Turn the system power ON and verify that all fans and peripherals turn on. Watch the displays
during power up to verify that no warning or error messages are displayed.
4
Probes Verify that the system properly recognizes all probes.
5
Displays Verify proper display on the monitor.
6
Presets Back-up all customer presets on a CD-RW.