GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
8-204 Section 8-7 - Mechanical Components Replacement Procedures
PRELIMINARY
8-7-5-4-1 Routing the Probe Cables
When routing the probe cables, it is important to lead the cables upwards from the system’s connecting
ports as shown in Figure 8-256. Always ensure that the cables do not drag on the floor and are
adequately secured by the Probe Cable Holder bracket and Left and Right Cable Hooks.
Observe the following practices:
1.) Lead the right probe cables upwards and thread them via the left and right cable holders as shown
in Figure 8-256.
2.) Open the cable gate (Figure 8-257) on the cable holder and slide the cables into the cable holder.
Figure 8-256 Probe Cables Routed Correctly through Probe Cable Holder Bracket and Cable Hooks
Figure 8-257 Opening the Cable Gate on Probe Cable Holder
Right Cable Hook
Probe Cable
Holder Bracket
Left Cable Hook