GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-21
PRELIMINARY
8-2-8 Rear Folder Box Replacement Procedure
8-2-8-1 Tools
None
8-2-8-2 Preparations
Shut down the Vivid S5 N or Vivid S6 N ultrasound unit, as described in 4-2-3 "Power Shut Down" on
page 4-7.
8-2-8-3 Rear Folder Box Removal Procedure
1) Remove all contents from the folder box.
2) Working from the rear of the system, hold the folder box with both hands and carefully lift it upwards
to release it from the two supporting screws - see Figure 8-22.
3) Remove the folder box.
8-2-8-4 Rear Folder Box Installation Procedure
1) Select the required folder box to best suit your needs.
2) Holding the box with both hands, carefully push it downwards to secure it on the two supporting
screws located at the rear of the support column- refer to the inset in Figure 8-22.
3.) Proceed to perform the following functionality tests:
- “Monitor Movement Test” on page 4-36
- “Operator Panel Movement Test” on page 4-35
Figure 8-22 Folder Box Installed on Vivid S5 N / Vivid S6 NSupport Column
THE FOLDER BOX HAS A MAXIMUM CARRYING CAPACITY OF 2 KGS.
DO NOT EXCEED THIS LIMIT!
Support Column
Supporting Screws