GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 10 - Care and Maintenance 10-27
PRELIMINARY
10-6-7 Isolated Patient Lead (Source) Leakage – Lead-to-Lead
NOTE: Refer to the procedure in the IEC 60601-1.
10-6-8 Isolated Patient Lead (Sink) Leakage - Isolation Test
NOTE: Refer to the procedure in the IEC 60601-1.
NOTE: It is not necessary to test each lead individually, or power condition combinations, as required
in previous tests.
Line voltage is applied to the ECG leads during this test.
To avoid the risk of possible electric shock, the system being tested must not be touched by
anyone (patient or operator), while the ISO TEST switch is depressed.