EasyManua.ls Logo

GE Vivid S6 N - Page 416

GE Vivid S6 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
7-32 Section 7-4 - Performing Front End (FE) Diagnostics
PRELIMINARY
7-4-2-2 DC Offset Verification (cont’d)
NOTE: For this test, there is one report (ADC Offset verification values) which is listed in the Reports
window on the right. By default, this report is displayed in the Reports window below.
9.) Use the scroll arrows at the bottom of the Reports window (see Figure 7-11 "View Test Log - CD
Offset Verification Test" on page 7-31) to scroll through the channels and view the corresponding
results.
10) When done, trackball to the Close button and press Set to close the View Report window.
11) After reviewing the test results, proceed as follows:
If no problems were identified, it is recommended to re-boot the system (this is obligatory when
prompted).
If no problems were identified but the problem persists, contact your local GE HEALTHCARE
field engineer for assistance.
If errors were identified but the results were marginal, perform calibration, as described in
“DC Offset Calibration” on page 7-27, and then repeat the test.
If errors were identified and the results were not marginal, verify that all system cables and
boards are connected (not misplaced) and functioning properly, as described in Chapter 5 -
Components and Function (Theory).
If the problem persists, this indicates that either the specific board you tested is faulty or that
another board that supports the operation of this board is faulty. Contact your local
GE HEALTHCARE field engineer for assistance.
12.)Trackball to the Exit button and press Set to close the View Test Log dialog box.
13.)Press the <Esc> button on the keyboard to close the Diagnostic Test Window.

Table of Contents

Other manuals for GE Vivid S6 N

Related product manuals