EasyManua.ls Logo

GE Vivid S6 N - Page 697

GE Vivid S6 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 8 - Replacement Procedures 8-171
PRELIMINARY
6.) Reconnect the ground cables and replace the tie-wraps previously removed.
7.) Replace the cable clamps.
8.) Reconnect any peripherals previously connected to the system.
9.) Return the system bottom rear cover, as described in the “Bottom Rear Cover Installation Procedure”
on page 8-23.
10) Return the system left rear cover (on the Distribution Board DIB side), as described in the “Left Rear
Cover Installation Procedure” on page 8-16.
11) Return the front cover, as described in the “Front Cover Installation Procedure” on page 8-19.
12) Return the left and right side covers, as described in the “Left Side Cover Installation Procedure” on
page 8-7 and “Right Side Cover Installation Procedure” on page 8-5.
13.)Turn ON power to the system.
14.)Proceed to perform the following functionality tests:
- “Grounding Continuity” on page 10-23
- “Chassis Current Leakage Test” on page 10-24
- “Full System Monitoring Test” on page 7-15
NOTE: If there is a peripheral connected via the AC Outlet cables, check the peripheral by performing the
following Peripherals Test:
- “Peripherals” on page 4-33.

Table of Contents

Other manuals for GE Vivid S6 N

Related product manuals