Main Machine Installation (D093/D094)
SM 3-9 D093/D094
Installation
No. Description Q’ty
15 Ferrite Core (For Network Cable) 1
16 Hinges: Upper Output Guide 2
17 Upper Output Guide 1
3.2.2 MACHINE INSTALLATION PROCEDURE
Before You Begin…
Condensation can occur on the drum the first time the machine is started up in a cold
environment, or if the machine has been stored for a long period in a cold location and moved to
a warm room.
If time permits, delay installation and allow the machine to set for at least 24 hours at room
temperature after moving it from a cold environment to a warm environment.
If the machine has already been installed elsewhere, connect the machine and allow it to
set overnight so the anti-condensation heaters can eliminate the moisture. (Main power
switch should be on and operation power switch off.)
Use a hand dryer to dry the area around the drum, or you can remove the drum and dry it
with a clean, dry cloth.