205
Adjusting knitting machine 4
Advanced adjustments
7. The reference run is complete, the machine is ready to knit.
The carriage is positioned at the correct position for you to be able
to start
the production.
8. Switch back to the pre
vious window.
Calling up and correcting
ma
chine data
1. Call up the "Basic settings" menu.
2. Call up the "Machine parameters" window.
3. Compare the displayed values with the target values on the machine data
sh
eet and if necessary correct the values in the window "Machine
parameter" and confirm them.
4. Switch back to the
pre
vious window.
5. Call up the "Needle bed parameters" windo
w.
6. Compare the displayed values with the value
s on the machine data sheet.
If necessary, correct the values on the machine data sheet.
7. Switch back to the pre
vious window.
8. Call up the "NPK values" window.
9. Compare the displayed values with the target values on the machine data
sh
eet. If necessary, correct the values in the "NPK values" window and
confirm them.
10. Switch back to the
pre
vious window.
11. Call up the "Needle selection" window.
12. Compare the displayed values with the target values on the machi
ne data
sheet. If necessary, correct the values in the "needle selection" window
and confirm them.
13. Call up the "Main menu".
Load knitting program and
de
termine r
acking reference
data
1. Load the knitting program.
2. Call up the "Machine start" window.
3. Tap on the key "SP from line 1".
4. Start the machine with the engaging rod.
T
he carriage assembly moves slowly and stops in the rig
ht reversing
position.
5. Wait until the "Racking finished" Message appea
rs on the touch screen.
6. To switch on the needle selection, tap the needle selection "On"
key in the
"Machine start" window.
The reference run is complete, the machine
is ready to knit.
Copying service data [201]
Copying service data [201]