GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
4-4 Section 4-2 - General Procedures
PRELIMINARY
4-2-2 Power ON/Boot-up (cont’d)
NOTE: In the next step, it is necessary to screw the plastic cable clamp (into the hole provided in the
support column - centrally located at the rear of the system, see Figure 4-2 "Plastic Cable
Clamp and Securing Screw" on page 4-4).
Then, to route the Mains Power cable upwards and through the clamp, and secure the clamp
in position to prevent the cable from dangling down and becoming caught in the wheels when
moving the scanner (see Figure 4-3 "Mains Power Cable Secured with Plastic Cable Clamp"
on page 4-4).
6.) Proceed as follows:
a.) Loosen the screw to open the plastic cable clamp.
b.) Route the cable upwards and through the clamp.
c.) Screw the clamp into position on the support column, carefully tightening the screw sufficiently
to secure the cable firmly in the clamp.
Take care not to overtighten the screw, or damage the cable!
7.) Connect the other end (male plug) of the Mains Power Cable to a hospital-grade mains power outlet
with the proper rated voltage.
8.) Turn ON the circuit breaker at the rear of the system.
The unit is now ready for Power ON/Boot Up.
.
Figure 4-2 Plastic Cable Clamp and Securing Screw
.
Figure 4-3 Mains Power Cable Secured with Plastic Cable Clamp
Screw hole for Securing Clamp
Plastic Cable Clamp
and Screw
Plastic Cable Clamp
Mains Power Cable