EasyManua.ls Logo

GE Vivid S6 N - Page 475

GE Vivid S6 N
834 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 7 - Diagnostics/Troubleshooting 7-91
PRELIMINARY
7-4-6 Probe Select Board Diagnostic Tests (cont’d)
The Full System Monitoring Test commences. While the test proceeds, the name of the test currently
in progress (ADC Test) is displayed in the Execute field and the current Loop # and specific test are
shown below. The messages Init Done and Please Wait are displayed beside the progress bar in the
Status area.
As the testing sequence progresses, the progress bar will advance to reflect the test progress.
Status indicators in the Data Flow map corresponding to the various system components will be
highlighted in the appropriate color to indicate the current test status, as follows:
Green: All recommended tests for these components have been completed and no problems
were identified.
Red: Problems were identified in these components during the performance of the test.
Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
6.) At any stage, trackball to the Pause button and press Set, if required.
7.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the Full System Monitoring Test sequence is complete:
- the Diagnostic Test window displays the Finished message
- the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in Figure 7-59 "View Test Log - Full
System Monitoring Test" on page 7-91.
NOTE: The Full System Monitoring Test has five sub-tests (Fixed Voltages, Temperatures, Fans
Speed, Battery Parameters, and Tx Voltages). These are listed in the Test column, as shown
in Figure 7-59 "View Test Log - Full System Monitoring Test" on page 7-91.
8.) Select the first report (Fixed Voltages); the report is highlighted in the Reports list, and the
corresponding results are shown in the Report window below, as shown in Figure 7-60 "View Test
Log - Full System Monitoring Test - Fixed Voltages" on page 7-92.
Figure 7-59 View Test Log - Full System Monitoring Test

Table of Contents

Other manuals for GE Vivid S6 N

Related product manuals