GE
P
ART NUMBER FN091065, REVISION 2 VS5 N AND VS6 N SERVICE MANUAL
Chapter 7 - Diagnostics/Troubleshooting 7-109
PRELIMINARY
7-5-1 Accessing the Monitoring Diagnostic Test Options (cont’d)
• Green: All recommended tests for these components have been completed and no problems
were identified.
• Red: Problems were identified in these components during the performance of the test.
• Yellow: The tests executed so far on these components have passed, but not all
recommended tests have been performed.
5.) At any stage, trackball to the Pause button and press Set, if required.
6.) To resume testing (from the point where you paused), trackball to the Start button and press Set.
When the Battery Parameters Test sequence is complete:
- the Diagnostic Test window displays the Finished message
- the View Test Log window opens automatically, listing all tests performed and showing details
of which tests passed or failed, as shown in the example in Figure 7-74 "View Test Log -
Battery Parameters Test" on page 7-109.
NOTE: For this test, there is one report (Battery Status) which is listed in the Reports window on the
right. By default, this report is displayed in the Reports window below.
7.) Check that the test passed and that result values for each sensor are within the pre-defined Lower
and Upper limits, as shown in Figure 7-74 "View Test Log - Battery Parameters Test" on page 7-109.
8) When done, trackball to the Exit button and press Set to close the View Report window.
9) After reviewing the test results, proceed as follows:
• If no problems were identified, it is recommended to re-boot the system (this is obligatory when
prompted).
• If no problems were identified but the problem persists, contact your local GE HEALTHCARE
field engineer for assistance.
Figure 7-74 View Test Log - Battery Parameters Test