EasyManua.ls Logo

Renault Duster 2007 - Page 325

Renault Duster 2007
1162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19A-24
COOLING
Water chamber: Removal - Refitting
K9K, and 796
19A
II - REFITTING OPERATION
a Refit:
-a new water chamber seal in the water chamber
housing,
-the water chamber.
a Torque tighten the water chamber bolts (11 N.m).
a Connect:
-the cooling hoses to the water chamber,
-the coolant temperature sensor connector,
-the EGR assembly outlet pipe,
a Position the air duct between the intercooler and the
EGR assembly.
a Connect:
-the air duct on the EGR assembly,
-the union to the vacuum pump.
a Connect the EGR solenoid valve pipe to the vacuum
pump.
a Clip on:
-the breather pipe from the gearbox,
-the EGR solenoid valve pipes.
a Position the expansion bottle.
a Torque tighten the expansion bottle nuts (8 N.m).
III - FINAL OPERATION
a Refit the front bumper (see Front bumper: Remov-
al - Refitting) (55A, Exterior protection).
a Refit:
-the air filter unit (see 12A, Fuel mixture, Air filter
unit: Removal - Refitting, page 12A-6) ,
-the engine undertray,
-the engine cover.
a Fill and bleed the cooling system (see 19A, Cool-
ing, Cooling system: Draining - Refilling, page
19A-6) .

Table of Contents

Related product manuals