EasyManua.ls Logo

Simrad ST90 - Installing the Gate Valve

Simrad ST90
536 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
102
442703/B
Installingthegatevalve
Thegatevalvemustbemountedsothatitstopmatingsurfaceisinparallelwiththesea
surfaceduringnormaloperatingconditions.Thetransducerdockontopofthegatevalve
mustremainverticalduringthesameconditions.
Prerequisites
Thistaskmusttakeplaceindrydock.Theshipyardmustprovideallnecessarytoolsand
manpower.Thefollowingspecicitemsarerequiredforthistask.
Siliconegrease
Anti-seizelubricant
Torquewrench
Liftingarrangement
O-ring
Mountinghardware
Note
Thegatevalveisheavy.Appropriateliftingequipment(liftingtackle,portablecraneor
ship’ scrane)isrequired.Alwaysuseappropriateliftingequipmenttominimizeriskof
personnelinjuryorequipmentdamages.Onlycertiedequipmentmustbeused.
Itisassumedthatthemountingangehasbeeninstalledcorrectly.
Context
Onlythebasicstepsofthetaskareoffered.Additionalprocedureswithmoreinformation
and/ordetailsmustbeprovidedbytheinstallationshipyardtotthevesselproperties.
Thetopmatingsurfaceofthegatevalvemustbeprotectedwithawoodencoverat
alltimesuntilthetransducerdockisinstalled.Itisveryimportantthatthissurfaceis
cleanandundamaged,becauseitmustbewatertightafterthetransducerdockhasbeen
installed.
Procedure
1Attachthenecessarytacklestothegatevalve,andmakesurethattheunitislifted
withthecorrectsideup.
Thegatevalvewillworkinanyposition,butwerecommendthatitismountedwith
itsidenticationtagsandclassicationmarkingsfacingup.Y oumustalsoconsider
theaccesstotheendswitches,and(ifrelevant)thehydraulichoseconnections.
SimradST90InstallationManual

Table of Contents

Other manuals for Simrad ST90

Related product manuals