EasyManua.ls Logo

Simrad ST90 - Environmental Inspection of the Transceiver Unit

Simrad ST90
536 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
442703/B
253
7Makesurethattherearenocorrosiveattacksonthehullunit,mountingange,
installationtrunk,supportbracketsorotherpartsoftheinstallation.
Result
Requirements
Results
Thehullunitiscorrectlyinstalledwitheasyaccessformaintenanceand
replacementofparts.
Thecompartmentinwhichthehullunitisinstalled("sonarroom")isclean
anddry.
Allcablesareproperlymountedwithenoughslack.
Thetransducercablescanmovefreelywhenthetransducerislowered
andhoisted.
Theweldsandmechanicalbracketsthatsupportthegantryarestrong
enoughtoholdthehullunitsecurelyinplaceunderalloperatingconditions.
Theweldsandbracketshavebeenpaintedwiththecorrectpreservation
mediumtopreventcorrosion.
Therearenocorrosiveattacks.
Dateandsignature:
Relatedtopics
Settingtoworksummary,page242
InspectingtheST90installation,page245
EnvironmentalinspectionoftheTransceiverUnit
Satisfactoryenvironmentalconditionsareimportanttoensurelongandtrouble-free
operationoftheTransceiverUnit.AnenvironmentalinspectionoftheTransceiverUnit
isrequiredtoverifythequalityofthesonarroom.
Prerequisites
TheST90isinstalledasspeciedinthismanual.Youneedthefollowingequipment:
Thermometer
Hygrometer
Context
ThesonarroomisthecompartmentinwhichtheTransceiverUnitisinstalled.
Procedure
1Makesurethatthecompartment("sonarroom")inwhichtheTransceiverUnitis
installediscleananddry.
2Makesurethattheambienttemperatureinthesonarroommeetstheenvironmental
specications.
Settingtowork

Table of Contents

Other manuals for Simrad ST90

Related product manuals