248
442703/B
aMakesurethatallcablesleadingtoandfromtheunithavebeenproperly
mountedandsecured.
bMakesurethatenoughslackhasbeenprovidedoneachcabletoallowfor
maintenanceandreplacement.
6Makesurethattheunithasbeenidentiedwiththerelevantproductlabel(s),and
thatonelabelincludesthepartandserialnumbers.
Result
Requirements
Results
TheProcessorUnitiscorrectlyinstalledwitheasyaccessformaintenance
andreplacementofparts.
TheProcessorUnitisfreefromscratches,dentsorotherphysicaldamage.
FreeaccesstoalltheconnectorsontheProcessorUnitisprovided.All
cablesareproperlymountedwithenoughslack.
TheProcessorUnitcanbefullyopenedforaccesstotheinternalparts.
TheProcessorUnitisproperlyearthed.
Dateandsignature:
Relatedtopics
Settingtoworksummary,page242
InspectingtheST90installation,page245
VisualinspectionoftheOperatingPanel
AvisualinspectionoftheOperatingPanelisrequiredtoverifythattheunithasnotbeen
physicallydamagedduringtheinstallation..
Prerequisites
TheST90isinstalledasspeciedinthismanual.TheST90isturnedoff.Youneed
thefollowingequipment:
•Multimeter
Procedure
1MakesurethattheOperatingPanelisinstalledinthecorrectlocation,andthatitis
suitablyorientedforeasymaintenanceandreplacementofparts.
2Makesurethatthephysicalinstallationoftheunithasbeencompleted.
aIftheunitisinstalledinsidearackorinaclosedcompartment,makesurethat
ampleventilationisprovidedtoavoidoverheating.
bMakesurethatamplespaceisprovidedaroundtheunittoallowfor
maintenanceandreplacementofparts.
SimradST90InstallationManual