Site Preparation Checklist
Chapter 9
Site Planning and Preparation
The condition of the installation site is important for proper operation of the HD
equipment.
This chapter describes planning and preparation activities for a
typical installation. It does not take into account local building or
electrical codes. Verify your site-specific planning, or consult
respective specialists.
Site Preparation Checklist 188
General Site Requirements 189
Compliance Criteria 190
Environmental Specifications 191
Heat Dissipation 192
Site Preparation Checklist
A qualified electrician must verify power requirements and power cable
requirements.
As the customer, you are responsible for ensuring that the site conforms
to all requirements, and that necessary peripherals are made available to
ADVA Optical Networking Service personnel during installation.
This checklist summarizes the tasks necessary to ensure your site is ready.
Check Task For More Information
Verify that environmental factors are within the
product tolerances.
l Compliance Criteria
l Environmental Specifications
Become familiar with the following:
l Site plan or floor plan
l Installation plan including details of the current
electrical systems
FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B 188