Installation Overview — 1U Shelf
Check Installation Procedure
Connecting the Optical Cables
For commissioning procedures, see the appropriate software document.
See Related Documents for the list of available documents.
l General Electrical Safety Guidelines and Warnings
l Installation Safety Guidelines and Warnings
l Electrical Safety Guidelines and Warnings
l Service Personnel Assumptions
Installation Overview — 1U Shelf
In this procedure, 1U shelf refers to these components:
l TR1
For an installation overview for the SH1R, see Installation Overview —
SH1R Shelf.
When you install a 1U shelf, be sure that you follow the installation procedures in the
proper sequence. This table is an installation procedure checklist, showing the
procedures in the order in which they should occur.
Check Installation Procedure
Unpacking a 1UShelf
Inspecting the HD Equipment
Installing the Mounting Brackets on a 1U Shelf
Mounting a 1U Shelf to a Rack
l Installation Safety Guidelines and Warnings
l Service Personnel Assumptions
239 FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B