EasyManua.ls Logo

Adva 3000R7 - Installing the Front Cover; Required Tools and Equipment

Adva 3000R7
495 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Required Tools and Equipment
Chapter 28
Installing the Front Cover
Required Tools and Equipment 351
Installing the SH12 Upper Front Cover 352
Installing the SH12 Lower Front Cover 353
Installing the SH4Rand SH4R-2 Front Cover 354
Pay attention to the optical cables when positioning the front cover.
Ensure that no optical cables are sandwiched between the cover and
the front of the shelf. Failure to do so can result in damage to the
fiber.
l Electrostatic Discharge Damage Prevention and Warning
Required Tools and Equipment
l ESD-preventive wrist strap or other personal grounding device
l Appropriate front cover(s) for the HD shelf
l Installation Overview SH12 Shelf
l Installation Overview SH4R and SH4R-2 Shelves
l Installation Overview SH1R Shelf
l Installation Overview 1U Shelf
l Electrostatic Discharge Damage Prevention and Warning
l Shelf Front Covers
l General Electrical Safety Guidelines and Warnings
351 FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B

Table of Contents

Related product manuals