EasyManua.ls Logo

Adva 3000R7 - Installation Overview - SH4 R and SH4 R-2 Shelves

Adva 3000R7
495 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation Overview SH4R and SH4R-2 Shelves
Installation Overview SH4R and SH4R-2
Shelves
When you install SH4R orSH4R-2 shelves, be sure that you follow the installation
procedures in the proper sequence. This table is an installation procedure checklist,
showing the procedures in the order in which they should occur.
Before installing the equipment, be aware of important rack and
accessory installation requirements. See Supported Rack
Requirements and Accessory Installation Requirements for more
information.
Before proceeding with the installation and cabling, be aware of
standard safety practices and the hazards involved in working with
electrical circuitry to prevent accidents.
Check Installation Procedure
Unpacking an SH4R and SH4R-2 Shelf
Inspecting the HD Equipment
Installing the Mounting Brackets on an SH4R and SH4R-2 Shelf
Installing the Mounting Bracket Adapters on SH4R and SH4R-2 Guide Rails
Installing the Front Cover Extension
Connecting the Grounding Terminals
Mounting the SH4R and SH4R-2 Shelf to a Rack
Installing the CEM
Installing the ECM
Installing the FTM-4 in the SH4R and SH4R-2
Installing the PSM-AC4 or PSM-AC5 in the SH4Rand SH4R-2
Installing the PSM-DC4 in the SH4Rand SH4R-2
Installing a Traffic Module
Installing a QSFPPluggable Transceiver
Installing the Slot Covers
Connecting the Infrastructure Modules
Shortening and Assembling DCPower Cables
Connecting DC Power to the SH4R and SH4R-2 Shelf
Connecting ACPower to theSH4R and SH4R-2 Shelf
Connecting AC and DCPower to theSH4R and SH4R-2 Shelf
Inspecting and Cleaning Fiber-optic Connectors and Receptacles
Connecting the Optical Cables
Installing the SH4Rand SH4R-2 Front Cover
237 FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B

Table of Contents

Related product manuals