Inspecting the HD Equipment
Do not drop the shelf or any modules on a hard surface - damage to
internal components may result. If any components are dropped,
return them to ADVA Optical Networking for examination and repair.
10. Verify that you have the proper shelf type, using the Product IDLabel for
identification.
11. Visually check the shelf and accessories for external damage. If identified, make
note of any damaged or missing items.
12. If any items are missing or you need additional information, notify your customer
service representative or ADVA Optical Networking immediately.
Each shelf comes with two 19-inch rack-mounting brackets preinstalled.
13. Save the packaging material until the operational checkout of the HD equipment is
complete. Storing all the shipping boxes and packaging material enables the HD
components to be repacked for a possible transport to another installation site or to
be returned for a needed repair.
l Shipment Contents — TR1
l Qualified Personnel Warning
l Shelf Lifting and Moving Guidelines
l Handling Equipment Precautions and Guidelines
l Electrostatic Discharge Damage Prevention and Warning
Inspecting the HD Equipment
You need to verify your shipment contents and check the HD equipment for any visible
damage.
This procedure assumes that your shelf shipped empty.
1. Attach a ground strap to your wrist and snap the ground wire to the wrist band. Insert
the ground plug into the grounded ESD jack.
2. Check the HD equipment for shipping damage or missing items. Make note if any are
identified.
3. Remove the front cover from the shelf and lay it aside (if applicable).
253 FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B