EasyManua.ls Logo

Adva 3000R7 - Unpacking an SH12 Shelf

Adva 3000R7
495 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unpacking an SH12 Shelf
Unpacking an SH12 Shelf
Each SH12 shelf is securely packaged in a shipping box. Depending on how you ordered
your system, your shelf may ship empty or with a minimum number of modules installed.
This procedure assumes that your shelf shipped empty. When unpacking
the SH12, ADVA Optical Networking recommends using a lift.
1. Attach a ground strap to your wrist and snap the ground wire to the wrist band. Insert
the ground plug into a grounded ESD jack.
2. Inspect the shipping boxes for evidence of damage during shipment. Claims for
damage during shipment must be asserted promptly with the transportation company
involved. If any damage or other signs of mishandling are evident, inform both the
freight carrier and ADVA Optical Networking before unpacking. Your freight carrier
can provide you with the procedures necessary to file a claim for damages.
3. Move the shipping box to a staging area as close to the installation site as possible,
where you have enough room to remove the shelf and components from the boxes.
Make sure that the shipping box has been in the installation location for a
minimum period of 24 hours to avoid thermal shock and surface
condensation when unpacking.
4. Open the shipping box:
a. Use a utility knife or scissors to cut open the band clamps strapping the shipping
box.
b. Lift the cap with the handles on the right and left side of the box so that the box is
opened.
5. Lift the tray from the top of the shelf and set it aside.
245 FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B

Table of Contents

Related product manuals