EasyManua.ls Logo

Adva 3000R7 - Page 246

Adva 3000R7
495 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Unpacking an SH12 Shelf
Figure 65: SH12 Packaging
6. Take inventory. A packing slip is located on the cap’s front side. Compare the
contents of the trays with the packing slip and the copy of the purchase order list or
equipment list provided by ADVA Optical Networking to ensure complete and
accurate shipment. Make note of missing items, if necessary.
7. Remove the shelf from the shipping box.
EQUIPMENT DAMAGE MAY RESULT IF YOU LIFT THE
SHELF BY INSERTING YOUR HANDS INTO THE SHELF.
Lift from the outside of the shelf to avoid damage.
8. Move the shelf to a stable surface in the work area and place it on a static-dissipative
mat. Do not release your grip until the shelf is secure.
ELECTROSTATIC CAUTION
Risk of damage due to electrostatic discharge!
Keep the shelf in its ESD protective bag until you are ready to inspect it.
Do not drop the shelf or any modules on a hard surface - damage to
internal components may result. If any components are dropped,
return them to ADVA Optical Networking for examination and repair.
FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B 246

Table of Contents

Related product manuals