For the SH12, the protection plate must be removed before installing
modules.
Use care when installing modules in a shelf. Ensure the modules are
properly aligned with the appropriate slot guides. Do not force a
module into a slot or onto the backplane connectors. If you are having
problems installing a module without using excessive force, stop
immediately and contact Technical Services.
Never reach into a vacant shelf slot. Contact with the adjacent
modules or the connectors on the backplane could result in damage
to the equipment. Exposed circuitry could also constitute an energy
hazard.
Risk of electromagnetic disturbances!
Be careful not to damage the EMI shielding gasket on the module
faceplate edges when inserting it into the slot. Otherwise EMC
compliance cannot be achieved.
FSP 3000R7 High-Density Subshelf Guide - R17.2 - Issue:B 298