Operation
221
Pos: 55.64 /Übersc hriften/Überschri ften 2/K-O/Nach dem Pressen @ 81\ mod_1315903074048_78. docx @ 708838 @ 22 @ 1
11.6 After Baling
Pos: 55.65 /Übersc hriften/Überschri ften 3/P-T/Rollboden en tspannen @ 192\mod_13820 85189848_78.doc x @ 1638195 @ 33 @ 1
11.6.1 Releasing tension on the floor conveyor
Pos: 55.66 /Abkürzun gen /Abkürzungen sprac hneutral/Rundbal lenpressen/Compri ma CV 150 / CV 210 XC @ 199\mod_1384939505 399_0.docx @ 1676121 @ @ 1
Comprima CV 150 / CV 210 XC
Pos: 55.67 /BA/Bedienun g /Rundballenpresse/ Nach dem Pressen CV/V @ 66\ mod_1302516404418_78. docx @ 617037 @ @ 1
VPN00001_2
1
2
3
Abb. 160
The tension on the front and the rear floor conveyor must be released after baling work is
complete.
• Loosen handwheel (2) until the display of the pressure gauge (1) shows a pressure of 50
bar (Parking position)
• Tighten handwheel (2) again
The clamping cylinders of the floor conveyors are depressurised.
Pos: 55.68 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0. docx @ 4165 @ @ 1