Operation
210
Pos: 55.6 /Überschri ften/Überschri ften 2/A-E/Einstellu ngen vor Arbeitsbeginn @ 59\ mod_1297346765539 _78.docx @ 556645 @ 22 @ 1
11.1 Adjustments Before Starting Work
Pos: 55.7 /BA/Bedienung / Rundballenpresse/ CF/CV Einstellungen vor Arbeitsbeginn @ 66\ mod_1302507319490_78. docx @ 616427 @ @ 1
Before starting work, perform or check the following settings:
• Tighten the floor conveyor of the bale chamber (Comprima CV150/CV210 XC)
(Please refer to Chapter entitled “Before Baling/After Baling")
• Working height of the Pick-up
• Position of the roller crop guide
• Switch the cutting system on or off
• Cutting length of the cutting system
• Use of the bale ejector
• Preselect the baling pressure (Comprima CF155 XC)
• Adjust the bale size (Comprima CF155 XC)
• Preselect the bale size (Comprima CV150/CV210 XC)
• Use additional tappet strips
Insert net
• Insert sheet
• Function of the chain lubrication system
• Reset the bale counter
The Required Working Steps are Described in the Chapters “Settings” and “Operation”.
The baling pressure may nee d to be reduce d.
Pos: 55.8 /Layout Mo dule /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0. docx @ 4165 @ @ 1